GeauxBids
Local public bid search

Orleans / New Orleans Public Bids for Contractors, translated into plain English.

Open public bid opportunities around Orleans / New Orleans with contractor-readable scope, agency, deadline, and source context.

Brass Water Service Fittings

Brass Water Service Fittings Get attachments at the SWBNO site. https://www.swbno.org/Bids/. Posted by Sewerage & Water Board of New Orleans. Trade fit: general.

Sewerage & Water Board of New Orleans | Due 2026-11-11

Paper Products and Janitorial Supplies

Paper Products and Janitorial Supplies Get attachments at the SWBNO site. https://www.swbno.org/Bids/. Posted by Sewerage & Water Board of New Orleans. Trade fit: Janitorial.

Sewerage & Water Board of New Orleans | Due 2026-11-11

Submersible Sewage Pumps

Submersible Sewage Pumps. Posted by Sewerage & Water Board of New Orleans. Trade fit: general.

Sewerage & Water Board of New Orleans | Due 2026-11-12

Drainage Point Repairs

Drainage Point Repairs. Posted by Sewerage & Water Board of New Orleans. Trade fit: Drainage.

Sewerage & Water Board of New Orleans | Due 2026-11-13

ST. CLAUDE AVE. BRIDGE (HBI)

H.016082 LA 46 ST. CLAUDE AVE. BRIDGE (HBI). Improvement: BRIDGE REHABILITATION. Estimated cost: $10,000,000 to $15,000,000. Length: 0.02 miles. Official LA DOTD six-month letting listing; letting dates are tentative until final official ad. Posted by Louisiana Department of Transportation & Development. Trade fit: Bridge / Heavy Civil.

Louisiana Department of Transportation & Development | Due 2026-11-18

NEW ORLEANS TULLIS - RIVER ROUTE

H.014042 LA 428 NEW ORLEANS TULLIS - RIVER ROUTE. Improvement: SHARED USE PATH, STRIPING, SIGNAGE. Estimated cost: $500,000 to $1,000,000. Length: 5.98 miles. Official LA DOTD six-month letting listing; letting dates are tentative until fin. Posted by Louisiana Department of Transportation & Development. Trade fit: Paving.

Louisiana Department of Transportation & Development | Due 2026-12-31

NOLA PED SAFETY IMPR - PHASE 2

H.015487 I-10, US 90, I-910 NOLA PED SAFETY IMPR - PHASE 2. Improvement: PED SIGNALS, CURB RAMPS, STRIPING, SIGNING AND RELATED WORK. Estimated cost: $10,000,000 to $15,000,000. Length: 5.2 miles. Official LA DOTD six-month letting listing. Posted by Louisiana Department of Transportation & Development. Trade fit: Paving, Concrete.

Louisiana Department of Transportation & Development | Due 2027-01-13

ANDREW HIGGINS: MAGAZINE TO CONVENTION

H.013150 ANDREW HIGGINS: MAGAZINE TO CONVENTION. Improvement: ROADWAY REHABILITATION, SIDEWALK AND LIGHTING IMPROVEMENTS. Estimated cost: $1,000,000 to $2,500,000. Length: 0.45 miles. Official LA DOTD six-month letting listing; letting date. Posted by Louisiana Department of Transportation & Development. Trade fit: Paving, Concrete, Electrical, Road / Heavy Civil.

Louisiana Department of Transportation & Development | Due 2027-03-10

US 61: AIRLINE @ CECIL INT IMP (ORLEANS)

H.016786 US 61 US 61: AIRLINE @ CECIL INT IMP (ORLEANS). Improvement: SIGNALS, REMOVAL OF PAVEMENT, CONCRETE CURB AND INC CONCRETE. Estimated cost: $250,000 to $500,000. Length: 0.05 miles. Official LA DOTD six-month letting listing; lettin. Posted by Louisiana Department of Transportation & Development. Trade fit: Paving, Concrete.

Louisiana Department of Transportation & Development | Due 2027-03-10

US 90: IHNC MB REHAB PH. 2 (DANZIGER)

H.014283 US 90 US 90: IHNC MB REHAB PH. 2 (DANZIGER). Improvement: STRUCTURAL, MECHANICAL AND ELECTRICAL REHABILITATION WORK. Estimated cost: $30,000,000 to $50,000,000. Length: 1.0 miles. Official LA DOTD six-month letting listing; letting. Posted by Louisiana Department of Transportation & Development. Trade fit: Electrical.

Louisiana Department of Transportation & Development | Due 2027-03-10

GeauxBids is not an official procurement authority. Official buyer postings, addenda, forms, deadlines, and submission instructions control every bid.