Start with these current public bid matches
Concrete / St. Tammany
CORA DRIVE SIDEWALK IMPROVEMENTS CITY PARISH PROJECT NO. 24-EN-HC-0025 EBR Parish Purchasing office has directed a review of the scope of work and has established a minimum EBE goal of 13% of the contract amount. Posted by City of Baton Rouge / EBR - Transportation And Drainage. Trade fit: Concrete.
City of Baton Rouge / EBR - Transportation And Drainage | East Baton Rouge | 2026-11-17 (due in 9 days) | Official source
CORA DRIVE SIDEWALK IMPROVEMENTS PROJECT. Posted by State of Louisiana. Trade fit: Concrete.
State of Louisiana | Statewide | 2026-11-17 (due in 9 days) | Official source
H.014470 E. PINE STREET SIDEWALKS. Improvement: SIDEWALK CONSTRUCTION. Estimated cost: $500,000 to $1,000,000. Length: 0.21 miles. Official LA DOTD six-month letting listing; letting dates are tentative until final official advertisement. Posted by Louisiana Department of Transportation & Development. Trade fit: Concrete.
Louisiana Department of Transportation & Development | Lafayette | 2026-11-18 (due in 10 days) | Official source
Keep this search working
Save these matches before you keep scrolling.
No card required. Your selected trade and service area stay attached to this request.
H.007530 US 165-Y JACKSON STREET CORRIDOR ENHANCEMENT. Improvement: NEW SIDEWALKS AND SIDEWALK LIGHTING. Estimated cost: $2,500,000 to $5,000,000. Length: 1.18 miles. Official LA DOTD six-month letting listing; letting dates are tentative u. Posted by Louisiana Department of Transportation & Development. Trade fit: Concrete, Electrical.
Louisiana Department of Transportation & Development | Ouachita | 2026-11-18 (due in 10 days) | Official source
H.016760 US 190 US 190: OPELOUSAS ADA RAMPS. Improvement: ADA COMPLIANT CURB RAMPS. Estimated cost: $250,000 to $500,000. Length: 0.57 miles. Official LA DOTD six-month letting listing; letting dates are tentative until final official adver. Posted by Louisiana Department of Transportation & Development. Trade fit: Concrete.
Louisiana Department of Transportation & Development | St. Landry | 2026-11-18 (due in 10 days) | Official source
H.015163 AYDELL LANE BRIDGE REPLACEMENT. Improvement: REPLACE AYDELL LN STRUCTURE W/ BOX CULVERT/CONCRETE BRIDGE. Estimated cost: $1,000,000 to $2,500,000. Length: 0.02 miles. Official LA DOTD six-month letting listing; letting dates are te. Posted by Louisiana Department of Transportation & Development. Trade fit: Concrete, Drainage, Bridge / Heavy Civil.
Louisiana Department of Transportation & Development | Livingston | 2026-12-09 (due in 31 days) | Official source